42 jobs since 2011. Here is every one.

Each block is one completed job, laid year by year since 2011. The notes mark our firsts. Tap any block to read the job.

42 completed contracts, 2011 to 2026

Show work
  1. 2011–13

    First contracts Eight houses for a Cebu developer.

  2. 2018

    First public works Pinamungajan hires us. Ten contracts since.

  3. 2019

    First water systems Two 120 ft deep wells for the City of Naga.

  4. 2020

    Largest job yet A pumping station with its own powerline, Toledo City.

  5. 2021

    First job for CEBECO II Line clearing. Nine contracts since.

  6. 2022

  7. 2023

    First rooftop solar 55kWp on a grain terminal in Mactan.

  8. 2024

    First net metering Solar for CTU Danao, and a steel footbridge.

  9. 2025

    First 69kV line Sub-transmission tapping in Borbon.

  10. 2026

    69kV on a live line Stringing for a Mactan distribution utility.

The record is long. These jobs tell it best.

Our largest contract, our largest utility award, our solar work and where it all started. Photos are from our sites in each trade.

From our civil sites
A new concrete box culvert with stone walls on a hillside road

₱6.44M Largest contract

Pumping Station #2, Brgy. Awihao

City Government of Toledo, 2020

Pump, powerline and pipeline under one contract: the civil work, the electrical work and the water line, built by one team.

Power lines

69kV Sub-transmission, Borbon

₱3.31M Largest utility award

69kV line tapping, Bongoyan to Poblacion, Borbon

CEBECO II, 2025

Labor services for tapping a 69kV sub-transmission line. A year later we strung 69kV on a live line for a Mactan utility.

From our building sites
A raised two-storey building painted blue and white, with a covered upper deck

₱3.31M Private school

Covered court

A private school, 2025

A covered court for a private academy: our largest private contract.

From our solar sites
Rows of solar panels on a green metal roof, the coast behind

55kWp Commercial solar

Rooftop solar on a grain terminal

A solar energy company, Mactan, 2023

Rooftop solar PV on a working grain terminal, installed for a solar energy company.

From our solar sites
Solar panels mounted along a factory roof, city towers behind

20kWp Net metering

Rooftop solar for a state university campus

CEBECO II, CTU Danao, 2024

Supply and installation of rooftop solar with net metering, for the electric cooperative.

From our building sites
A finished single-storey building with a new roof and gutters
A finished room with blue walls and louvred windows

8 houses Where it started

Houses for a Cebu developer, in four subdivisions

A Cebu real estate developer, 2011 to 2013

Our first contracts were private homes, built to a developer’s spec. The same developer came back in 2018. Fifteen years on, we still build houses, now with the engineers and licences of a public-works contractor.

Who we build for. And who came back.

Most of the record is public work, with specs, inspections and paperwork on every job. Private clients get the same standard.

Share of contract value

  • 54% Government 20 jobs, ₱25.20M. Towns, cities, barangays and state universities.
  • 25% Electric cooperative 9 jobs, ₱11.64M. Cebu II Electric Cooperative (CEBECO II).
  • 21% Private 13 jobs, ₱9.98M. Companies, private schools, developers and a distribution utility.

Clients who came back

  • 10 Municipality of Pinamungajan 10 contracts since 2018
  • 9 CEBECO II electric cooperative 9 contracts since 2021
  • 9 A Cebu real estate developer 9 contracts since 2011
  • 5 City Government of Toledo 5 contracts since 2019

Questions owners ask. Straight answers.

Something else on your mind? Call or text 0916 564 4873.

Is the site visit really free?

Yes. An engineer visits your site or reviews your plan, then sends you a written estimate and timeline. You pay nothing for the visit.

How much will my project cost?

It depends on the site, the design and the materials, so we do not quote from a price list. After the site visit you get the price and the timeline in writing, before any work starts.

Are you licensed?

Yes. We are PCAB-licensed in General Building, General Engineering and Electrical Works, PhilGEPS-registered, and DTI-registered since 2011. A Registered Civil Engineer and a Registered Electrical Engineer are on staff.

Can one team handle the building and the power?

Yes. We build the structure, wire it, put solar on the roof and run power lines, from 13.2kV distribution to 69kV sub-transmission. You deal with one contractor from site visit to handover.

What do you need for a solar assessment?

Three to six months of power bills and a look at your roof. We come back with a proposed system size in kWp, the estimated savings and payback, and the steps for net metering.

Is the work under warranty?

Yes. All our workmanship carries a one-year warranty.

Have you done jobs like mine?

Since 2011 we have completed 42 contracts worth ₱46.8M: houses, school buildings, covered courts, building electrical works, rooftop solar and power lines for electric cooperatives. Ask us about similar work when we visit.

Tell us about your project. The site visit is free.

An engineer visits your site and sends a written estimate and timeline.

Rather talk now? Call 0916 564 4873