One contractor for the building, another for the power?
Foundation to solar roof. One licensed team.
Trusted by LGUs and electric cooperatives for 15 years and 42 contracts. Now building for homes, businesses and plants across Cebu.
- Risk-Free First Step Free engineer site visit. Written estimate before work starts.
- 1-Year Warranty On all our workmanship.






15 years building in Cebu
42 contracts completed
₱46.8M in completed work
3 provinces: Cebu, Bohol, Leyte
What we build. Four trades, one team.
A Registered Civil Engineer answers for the structure and a Registered Electrical Engineer for the power. You deal with one contractor from site visit to handover.

Solar PV
Rooftop and ground-mount solar for businesses, schools and homes, with net metering.
55kWp Rooftop solar for a grain terminal in Mactan, 2023.

Building
Homes, school buildings, covered courts, renovations and repairs.
8 houses Built for a Cebu real estate developer, 2011 to 2013.

Electrical Works
Wiring, cabling, genset connections, street lighting and building electrical works.
₱2.70M Genset wiring to government buildings, Pinamungajan, 2018.
69kV sub-transmission
13.2kV distribution
Power Lines
Distribution and sub-transmission lines, live-line work, subdivision tapping and line clearing.
₱3.31M 69kV line tapping in Borbon for CEBECO II, 2025.
Why owners hire us. It is all on paper.
Four things owners check before they sign a contractor.
- Licensed in three categories A PCAB-licensed contractor, registered with PhilGEPS and with the DTI since 2011.
- Engineers on staff Licensed engineers answer for the plan. Certified crews do the work.
- One team for structure and power The building, the wiring and the solar roof are planned together, with one contractor answering for all of it.
- Our own equipment The job does not wait on rentals.
How a job runs. No surprises.
Four steps, in this order, whether it is a house or a 69kV line. You know the price and the timeline before we start.
- Step 1 Site visit An engineer visits and checks the site or your plan.
- Step 2 Estimate You get a written estimate and timeline before any work starts.
- Step 3 Build A licensed crew on a safe, orderly site.
- Step 4 Handover A final walk-through, with a one-year warranty.
Built to public-works standards. Now building for you.
Most of our 42 contracts were for towns, cities, state universities and electric cooperatives. Public jobs come with specs, inspections and paperwork. We run private jobs the same way.



Largest public jobs
- ₱6.44M Pumping station with pump, powerline and pipeline, Toledo City, 2020.
- ₱3.50M Wastewater treatment facility, Consolacion, 2020.
- ₱1.63M Steel footbridge, Brgy. Awihao, Toledo City, 2024.
Also on record: deep wells, water tanks, road concreting, drainage and slope protection.
Clients who came back
- 10 Municipality of Pinamungajan 10 contracts since 2018
- 9 CEBECO II electric cooperative 9 contracts since 2021
- 5 City Government of Toledo 5 contracts since 2019
Questions owners ask. Straight answers.
Something else on your mind? Call or text 0916 564 4873.
Is the site visit really free?
Yes. An engineer visits your site or reviews your plan, then sends you a written estimate and timeline. You pay nothing for the visit.
How much will my project cost?
It depends on the site, the design and the materials, so we do not quote from a price list. After the site visit you get the price and the timeline in writing, before any work starts.
Are you licensed?
Yes. We are PCAB-licensed in General Building, General Engineering and Electrical Works, PhilGEPS-registered, and DTI-registered since 2011. A Registered Civil Engineer and a Registered Electrical Engineer are on staff.
Can one team handle the building and the power?
Yes. We build the structure, wire it, put solar on the roof and run power lines, from 13.2kV distribution to 69kV sub-transmission. You deal with one contractor from site visit to handover.
What do you need for a solar assessment?
Three to six months of power bills and a look at your roof. We come back with a proposed system size in kWp, the estimated savings and payback, and the steps for net metering.
Is the work under warranty?
Yes. All our workmanship carries a one-year warranty.
Have you done jobs like mine?
Since 2011 we have completed 42 contracts worth ₱46.8M: houses, school buildings, covered courts, building electrical works, rooftop solar and power lines for electric cooperatives. Ask us about similar work when we visit.
Tell us about your project. The site visit is free.
An engineer visits your site and sends a written estimate and timeline.
Rather talk now? Call 0916 564 4873